Construction

Major construction projects for 2024 in Barrhaven East, including road resurfacing, sidewalk rebuilds, and other work which may require road cuts, lane closures, or adjustments in traffic, pedestrian, and cyclist patterns are listed below.

Minor works, projects completed in previous years, fibre optic installations, and projects in other wards are not listed.

Projects are sorted by start date.

 

New pedestrian crossover

Cresthaven/Baypointe

15 August 2023 to 4 September 2024

STATUS: COMPLETE

Construction of a new pedestrian crossover and appropriate ramping and accessibility measures across Cresthaven on the north side of Baypointe. Includes sidewalk work in front of 5, 7, and 9 Baypointe to connect to electric transformer box.

 

Road resurfacing

Woodroffe between Longfields and Claridge-Stoneway

2 July to 26 July 2024

STATUS: COMPLETE

Road resurfacing, select sidewalk panel replacement, and accessibility improvements for pedestrians.

 

Sidewalk rebuild

Stoneway between Wittingham and Forest Gate

8 July to 9 August 2024

STATUS: COMPLETE

Full rebuild of sidewalks on both sides of Stoneway between Wittingham and Forest Gate (east). Select panels will also be replaced between Woodroffe and Wittingham on the north side of Stoneway. Residents who will lose access to their driveways will receive a notice and a temporary street parking permit.

 

Infrastructure connection

Woodroffe/Deerfox-Stoneway

14 August to TBD

STATUS: DELAYED

Overnight construction at the intersection of Woodroffe/Deerfox-Stoneway to allow for a new water and sanitary connection to the commercial properties on the west side of Woodroffe. No closures expected, but lane reductions may be necessary to accommodate the works.

 

Road resurfacing

Woodroffe between Fallowfield and railway

16 September to 27 September 2024

STATUS: ONGOING

As required by law when working near railways, a flagging service must be hired during working periods to ensure proper communication and safety between crews and railway authorities. The flagging service is sole-sourced by Via Rail who coordinated and approved flagging services in June. Via Rail notified the City mid-July they were no longer able to provide the required service. As such, the work was delayed.

 

Road resurfacing

Prince of Wales between Rocky Hill and Lodge Road

Dates TBD

STATUS: DELAYED

Prince of Wales Drive was resurfaced in 2023 between Lodge Road and Bankfield. A short section north of Lodge Road was due to be resurfaced but was delayed to accommodate road cuts for the police station construction.

Resurfacing will be completed at a future date.